support:OEM & ODM
operation mode:arc welder welding
manner:argon arc
Motor test bed: the performance parameters such as voltage, current, power flow test.
The engine test bed: power performance parameters of voltage, current, comprehensive test.
Line: meet the annual production of 300000 sets of production requirements
Warehouse: meet the monthly output of 30000 units with turnover
Durability test board: it is mainly used for life test for the product.
Multifunctional test board: the machine temperature rise test and develop new products of various performance parameters of the test (this kind of test bed under the constant temperature test).
Quality policy:
Scientific management, is committed to continuous improvement, the pursuit of high quality, achieve customer satisfaction.
Quality goal:
Product return rate was below 5%, timely delivery rate is above 98%, customer satisfaction rate reaches above 95%.
Quality idea:
Don't use nonconforming product, manufacturing nonconforming, not out of nonconforming product.